Burlington Transit schedule changes effective Oct. 4
As of Oct. 4, Burlington Transit has made changes to its schedules, affecting a number of routes. In addition, all bus routes going to Appleby GO station will now use the newly expanded transit loop on the south side south of the station.
Schedule changes:
• Routes 80, 81 and 83 will be moving to the south side of the Appleby GO station. All Burlington Transit bus routes will now connect on the same side of the station.
• Routes 1 and 101 will be returning to their regularly scheduled route, which was temporarily adjusted in May 2015 for construction on Waterdown Road. This construction is now complete.
• Routes 4, 15 and 20 have been adjusted to better align with recent changes to the GO Transit schedule.
Updated schedules for routes 5 and 21 in addition to some minor trip adjustments on routes 2, 3, 6, 10, 20 and 40 will be included.
For more information, visit www.burlington.ca/transit.